NOLA permitting

HDLC Permits 101: Renovating in a New Orleans Historic District

Short answer: for a Louisiana residential property in New Orleans, check whether its address is in an HDLC or VCC review area before exterior work. The City regulates multiple historic districts and designated landmarks, and a short district list cannot determine whether a particular property needs review. Use the City's Property Viewer and call HDLC if you are unsure; commission review is separate from any building permit.

What does the New Orleans HDLC review?

The commission's jurisdiction is the exterior envelope: paint colour, doors, windows, roofing material, balconies, fences, signs and anything that changes how the building reads from the street. Interior work is generally outside the review, which is why a full interior renovation can move without a commission hearing while a new front door cannot.

Approval is of the exterior as a whole, not of each change separately. That single detail is what turns a straightforward renovation into a multi-month process for owners who submit one item at a time.

The three paths a property can be on

Full HDLC review

Architectural review by the commission, on the record. Required for additions, new construction in a district, demolition, and any exterior change that is not on the commission's list of routine maintenance items.

HDLC lite review

Staff-level administrative review for a defined set of routine exterior items, roofing material colour, paint, minor repairs, that still sit inside a district. Faster than full review, but still a review: the work is not exempt, it is delegated to staff.

Confirm whether historic review applies

Do not infer that a property is outside review from a neighborhood name or a short district list. Check the address in the City's Property Viewer and contact HDLC before exterior work if the result is unclear. Building permits may also be required.

How to get through review without losing a season

  1. 1

    Confirm which commission has jurisdiction

    The Vieux Carré is handled by the VCC. The City also has multiple HDLC-administered historic districts and individually designated landmarks, so these examples are not a complete list and a property outside them may still be subject to review. Check the City's Property Viewer by address and call or contact HDLC before exterior work if you are unsure.

  2. 2

    Find out whether you are on the full or lite path

    Routine exterior maintenance sits on the staff-level lite path. Anything structural, anything on a primary facade, anything that changes the building's footprint or appearance in a way the commission has not pre-approved goes to full architectural review.

  3. 3

    Prepare the exterior scope as a set, not as items

    Review is of the whole exterior envelope as it will exist, not of each change in isolation. Homeowners who apply item by item discover that the third application is judged against the first two. Bring the complete exterior scope once.

  4. 4

    Plan the review into the schedule

    Review timing varies by project and application. Ask HDLC about the current process and schedule enough time for a commission decision before work that depends on it, particularly anything that touches the roof line or the openings.

Examples of HDLC areas

  • Uptown
  • Garden District
  • Algiers Point
  • Faubourg Marigny
  • Treme
  • Esplanade Ridge
  • Parkview

These are examples only, not a complete list of districts or individually designated landmarks. The Vieux Carré is handled by the Vieux Carré Commission (VCC). The Central Business District has its own landmarks commission (CBD HDLC), so an address inside the CBD district's boundaries is reviewed by that body rather than by the HDLC, a downtown address outside those boundaries is not a CBD HDLC case. For a Louisiana residential property, search the address in the City's Property Viewer and contact HDLC before exterior work if you are unsure which review applies.

Where can New Orleans homeowners check current HDLC rules?

Check the property address in the City of New Orleans Property Viewer for historic or conservation district information, then contact HDLC before exterior work if you are unsure. The HDLC page links commission information and application resources. The City sources are Property Viewer and HDLC. A property lookup is a starting point; ask HDLC to confirm when jurisdiction is unclear.

HDLC FAQ

What is the HDLC and when do I need their approval?

The Historic District Landmarks Commission (HDLC) and the Central Business District Historic District Landmarks Commission regulate local historic districts and designated landmarks outside the Vieux Carré. If your Louisiana residential property may be in one of these areas, check its address in the City of New Orleans Property Viewer and contact HDLC before exterior work; the Vieux Carré is handled separately by the Vieux Carré Commission (VCC).

How long does an HDLC review take?

Review timing varies by project and application. Ask HDLC about the current process and allow time for historic review as well as any other required permits; do not assume the reviews will run in parallel.

What districts in NOLA fall under HDLC jurisdiction?

The City regulates multiple local historic districts and can designate individual landmarks, so a short list is not a reliable jurisdiction check. For a Louisiana residential property, search the address in the City of New Orleans Property Viewer and call or contact HDLC before exterior work if you are unsure. The Vieux Carré is handled separately by the VCC.