Service page: Solar, battery and generator backup power
What a home microgrid is
The Department of Energy defines a microgrid as a group of interconnected loads and energy sources inside a clear electrical boundary, able to run connected to the grid or disconnected from it. Utility microgrids cover a campus or a neighborhood. A home microgrid is the same idea drawn around one house.
In practice it means a house that can take itself off Entergy's lines and keep running. The panels on the roof, the battery on the wall, the generator on its pad and the transfer switch beside the meter are not four separate purchases. They are one system with one control point, and that is what makes it a microgrid rather than a collection of equipment.
The service page for solar, battery and generator backup power covers how we scope and build these systems. A home microgrid is the wider term, and this guide is about how the pieces fit together in a Louisiana house.
The four parts of a home microgrid
Almost every home microgrid comes down to the same four parts. What changes from house to house is size, not architecture.
- The array. Solar panels on the roof or on a ground mount. The array produces the most power on a clear afternoon and the least under a storm cloud, which is exactly when a Louisiana house needs it.
- The battery and inverter. A battery stores what the array makes and holds it for the evening. The inverter turns stored direct current into the alternating current the house uses, and it sets the rules for what the house can run at once.
- The standby generator. A permanently installed unit on a pad, running on natural gas or propane. It is the part that keeps going through a long outage, after the battery has been drained and the sun has been down for a day.
- The transfer switch. The automatic transfer switch is the safety device that separates the house from the utility lines and decides whether the house runs on the grid, the battery or the generator. The National Electrical Code treats these systems in Article 702, and the switch is why a house can run on its own without backfeeding the street.
A home microgrid compared with a generator alone
A standby generator by itself is a solid answer for an outage and it has limits. It runs as long as fuel arrives. It is loud enough to hear from the neighbor's yard. It needs oil changes and an exercise cycle. And a small one cannot start a central air conditioner, so the house stays hot even with the lights on.
A battery by itself is quiet, instant and clean. It also has a hard ceiling: when the stored energy is gone, the house is dark, and in a week of rain the array will not refill it fast enough.
Put the two together in a microgrid and each covers the other's weakness. The battery carries the first hours silently and takes over again when the sun returns. The generator handles the long middle of an outage, runs the heavy loads and recharges the battery. That pairing is the reason a microgrid earns its name: it is one supply system with two engines.
The standby generator and battery comparison takes the two options apart in more detail, including the noise, fuel and maintenance questions that decide it for most households. The standby generator page and the battery backup page each go deeper on one half of that pairing.
What a home microgrid can run
A microgrid is sized from a load list, not from a product. We write the list with the homeowner, in order of what matters: the refrigerator and freezer, a few lights, fans, the internet router, medical equipment, a window unit in one room, the well pump if the house has one.
Central air is the item that decides the size of everything else. A compressor draws a large surge when it starts, and a system that can carry it through the night is a different order of equipment from one that carries the refrigerator and the lights. Many Louisiana homes run a small window unit or a mini split on the backup circuits instead, and keep the central system for grid power.
A well pump is the second surprise. A 240 volt pump motor pulls several times its running current at startup, so a battery inverter has to be chosen for that surge and not for the average draw. The hurricane outage sizing guide walks through that arithmetic.
Once the load list exists, the rest of the microgrid is measurable. Add the running watts, multiply by the hours, add the startup surge for anything with a motor, then decide how many days the house should carry itself.
Hurricane outages and what Louisiana adds
The Atlantic hurricane season runs from June 1 to November 30, and the National Hurricane Center keeps the official calendar. A Louisiana outage in that window arrives with heat, humidity and mosquitoes, and it usually arrives with a damaged roof, a flooded street or a tree on a service drop.
That changes the priority list. A fan and a working refrigerator protect health in a way a television does not. Fuel resupply is a real planning problem, because a natural gas line usually stays pressurized while a propane tank empties. Solar production falls under storm cloud but does not stop, and a system sized for a sunny day will underperform on the third day of rain.
A microgrid planned in March and installed in May is worth more than one ordered the week a storm enters the Gulf. It also changes the order of work. A backup system bolted to a roof that needs replacing is money spent twice, so the roof and the storm damage come first. Our hurricane recovery and storm damage roof repair pages cover that side of the job.
Permits, licensing and who does the electrical work
For a microgrid in the City of New Orleans, a rooftop solar system is an electrical permit, and plan review runs through SolarAPP+. Since March 2025 the permit has to be pulled by a contractor holding a Class A Master Electrical Contractor licence from the City. On a house in a historic district, a Certificate of Appropriateness from the HDLC or the Vieux Carre Commission comes before the building permit.
A standby generator adds its own steps: an electrical permit, a fuel connection, and a placement review that keeps the exhaust away from windows and doors. Jefferson Parish is a separate jurisdiction with a separate permit path, and a City of New Orleans licence does not travel there. The New Orleans building permits guide covers the general sequence.
Jazzy Construction holds LSLBC Residential Construction License #8725 and works statewide. The electrical scope on a home microgrid is performed by a licensed Class A master electrical contractor, because the City requires one for the solar permit. We run the project around that: the scope, the permits, the roof work, the coordination and the warranty.
How a home microgrid is sized
Three numbers decide the design of a microgrid. The first is the running load in watts, taken from the load list. The second is the startup surge, taken from the largest motor on the list. The third is the time the house should carry itself, in hours or days.
From those three we get a battery capacity, an array size and a generator size. The array has to refill the battery on an ordinary day. The generator has to carry the loads the battery cannot, for as long as the fuel lasts. The transfer switch has to be rated for the whole service.
An oversized system is as much a mistake as an undersized one: it costs more, it takes more wall space, and it does not run the house any better. The right size comes from the list, not from a square footage rule of thumb.
What a home microgrid cannot do
A microgrid does not make power free. It does not make a house storm proof, and it does not repair a roof, a foundation or a flooded electrical panel. It does not run central air for a week on a single battery, and it does not keep a well pump running on a system sized only for lights.
It also does not come with a federal credit right now. The 30 percent Residential Clean Energy Credit applied to property placed in service through December 31, 2025. We will not quote a credit that has ended, and we will not put a number on an incentive we cannot verify for your address.
What a microgrid does is keep a house livable when the grid goes down, which in southeast Louisiana is a practical question and not a philosophical one. If you want to price one, our quote request gets you a rough estimate in 24 to 48 hours, and the bid follows a site review.
Common questions
- What is a home microgrid?
- A home microgrid is a house wired so it can run on its own power. Solar panels and a battery carry the daily load, a standby generator covers long outages, and a transfer switch separates the house from the utility lines. It works connected to the grid or disconnected from it.
- Can a home microgrid run my air conditioning?
- It can, and the size jumps. A central compressor draws a large starting surge, so carrying it means a bigger battery, a bigger generator or a soft start kit on the unit. Many Louisiana households put a window unit or a mini split on the backup circuits instead and leave central air on grid power.
- How long can a home microgrid run the house?
- The battery carries essential loads for hours and the generator keeps going as long as fuel arrives, so the honest answer is that it depends on the load list, the battery capacity and the fuel supply. We size from the hours you want, not from a brochure number.
- Do I need a permit for a home microgrid in New Orleans?
- Yes. A rooftop solar system is an electrical permit reviewed through SolarAPP+, and the permit has to be pulled by a contractor holding a Class A Master Electrical Contractor licence from the City. A standby generator adds an electrical permit, a fuel connection and a placement review. Historic districts add a Certificate of Appropriateness first.
- Is a home microgrid the same as going off grid?
- No. A home microgrid stays connected to the utility and disconnects when the utility fails. An off grid property has no utility connection at all and has to carry every load, every day, from its own equipment. The equipment overlaps and the sizing does not.
- What does a home microgrid cost?
- It is priced from the scope the same way a renovation is: array size, battery capacity, generator size, the electrical service and the permitting. Send a complete request and you get a rough estimate within 24 to 48 hours. After the site review you get the bid, with the scope, the schedule and the payment draws.
Sources
- U.S. Department of Energy, Microgrid Systems
- U.S. Department of Energy, Solar Integration: Distributed Energy Resources and Microgrids Basics
- U.S. Department of Energy, Homeowner's Guide to Going Solar
- NFPA 70, National Electrical Code, Article 702 (optional standby systems)
- National Hurricane Center, tropical cyclone climatology
- City of New Orleans, One Stop Shop permits
- Louisiana State Licensing Board for Contractors
- American Red Cross, power outage safety
Rules, programs and prices change. Check the source before you rely on a figure, and ask us to confirm it for your property.